Project N-16586: Replacement of Obsolete Bus Bar &
Circuit Breaker Fail Protection Systems in UNPS, MOS1 & AAPS Substations - In
this project, the existing bus bar and breaker failure protection systems shall
be replaced by new low impedance type combined bus bar and breaker failure
protection system in UNPS 132kV, MOS1 132kV and AAPS 220kV substation;
including associated power/control cables & accessories.
UAE
2019 - 2021
Project N-16595: Replacement of existing old Protection
Panels, AVR&TPI Panels, Fault Monitoring System and Event Recorder System
at Al Wagan Grid Station - In Al Wagan 220/33 kV Grid Station, there are OHL
feeder protection, Bus Section bay protection, 220/33KV 80MVA Transformer,
220/33/11KV 80MVA Transformer & Busbar/Breaker Failure protection panels
supplied by ABB and Fault Monitoring System, Event Recorder System and
AVR&TPI System supplied by SIEMENS is available. PESCO is replacing
existing Protection panels, AVR/TPI system panels, Fault Monitoring System
panels & Event Recorder System panels with new Protection panels, AVR/TPI
system panels, Fault Monitoring System panels & Event Recorder System
panels as per DOE standard specifications for Control & Protection.
UAE
2018 - 2021
Project N-13103 : Replacement of existing Fault Monitoring
Systems (FMS) in nine Sub Stations in Al Ain region due to reasons of aging
and/or obsolescence - The list of Stations are as follows: DHMG - 400 kV , DHMG
- 220 kV, AHYG - 220 kV, SNYG - 220 kV, MZDG - 220 kV, ARDG - 220 kV, AAPS -
220 kV, CTCG - 220 kV, KHZG - 220 kV.
UAE
2017 - 2018
N-14878
Remote-end Modification Works For 132kV Cable Circuits at BHYG
Saudi
City 110/13.8KV S/S Testing & Commissioning - KSA
KSA
2004 - 2006
132KV W13
& W17 Substation Remote End Works – 2007 & W59, E4 & E11 S/S's
Single to Double Bus Bar Upgrade Project with all the relevant Primary and
secondary required modifications
2004 - 2005
132/11 KV CHNA Substation Testing and Commissioning - UAE
UAE
2004 - 2005
Testing and
Commissioning of:
Al-Safa 110/13.8kV S/S
-Jeddah
Saudi City 110/13.8KV
S/S –Jeddah
Al-Taif 380/110KV
-Al-Taif
Khayber 110/33/13.8KV
–Khayber
Jeddah
2004 - 2005
Al-Taif
380/110KV Testing & Commissioning - KSA
KSA
2004 - 2004
Al-Safa
110/13.8kV S/S Testing and Commissioning - KSA