PESCO International has immense experience working with various instrumentation systems. We provide installation, testing, and calibration services for transmitters and gauges for controlling pressure, level, temperature, and flow.
PESCO International has a meticulous E&I team that specializes in the installation, testing, and calibration of control valves, shut down valves (SDV), Blowdown valves (BDV), and pressure switches.
Safety is the biggest concern in any industry. Our E&I team has precisely installed safety release valves (SRV), pressure safety valves (PSV), and self-actuated pressure reduction valves in numerous projects. Our surgical approach in the installation and calibration helped reduce safety concerns in high-risk environments.
PESCO International's team of engineers and technicians will work closely with the client to devise an effective plan to install fire alarms and detectors. We follow all the HSE rules and regulations and will provide training to all concerned. We strive to be one of the best fire detection system installation companies in the UAE, Egypt, and the Middle East.
PESCO International's instrumentation team is well capable of working on DCS (Distribution Control System), PCS (Process Control System). We have done the installation, setting, and calibration for DCS systems like FOXBORO I/A SERIES, Honeywell TDC-3000, and EXPERION PKS. Our instrumentation team catapults us to become the best PCS/DCS system services company in UAE.
Safety is the biggest concern in any industry, especially in the oil & gas and power plants. Emergency Shutdown Systems (ESD) and Fire and Gas Systems (FGS) are essential in high-risk environments to prevent any mishaps. PESCO International provides the installation, setting, and calibration of ESD & FGS systems. We have experience installing safety systems such as TRICONEX TMR, Honeywell FSC.
PESCO International's instrumentation engineering team focuses on the precise installation and calibration of PLCs (Programmable Logic Controllers). We have experience in installing and calibrating PLC modules of Allen-Bradley, Siemens, and Schneider. Being a pioneer PLC service company in UAE, we focus on enhancing various processes in power plants, oil & gas industries.
Monitoring and controlling critical equipment is necessary for power plants, oil & gas industries. Being a pioneer SCADA service provider, we focus on remote monitoring of equipment and assets exactly. Our team has experience working with AB RSVIEW32, GE Cimplicity Workbench.
Solar turbine concentrates heat energy from the sun to produce steam. Electricity is produced using steam turbine generators. PESCO International provides installation, testing, commissioning, and start-up assistance for solar turbines.
Emergency communication and broadcasting are essential in large industries. PAGA system makes this communication quickly as possible. Our team of engineers and technicians is well versed in the installation of the PAGA system. This enabled PESCO International to be a key player among PAGA system installation companies in UAE, Egypt.
We provide installation, testing, and commissioning services for instrument air compressors. We have experience installing instrument air compressors of Ingersoll-Rand & Atlas Copco.
PESCO International is an expert in installing, testing, commissioning, and start-up of flare ignition systems. We have experience working with the flare ignition systems of John Zink.
Gas analysers are necessary for the analysis of process gases in industries. With numerous installations of gas analysers, we focus on precise output. We have experience installing SIEMENS Maxum, Microsam, and EMERSON GC 700.
Glycol plants are essential in oil & gas and power plants to remove excess water from gas and oil stored in reservoirs. Our engineers devise the best possible method for installing glycol regenerating packages focusing on increasing plant efficiency. We are among the top-rated glycol system installation companies in UAE, Egypt, and the Middle East. (what is this CB&I)
PESCO International provides installation, testing, commissioning, and start-up services for the burner management system. Our commitment is to reduce maintenance and provide a safe environment for the boiler and plant personnel.
PESCO International has a meticulous team of engineers and technicians who focus on the precise installation of instrumentation packages by implementing rigorous testing procedures and procedure-oriented commissioning methods.
Mena Road, Silver Waves Tower
P.O Box: 127748
Plot 6/7,
Industrial Zone,
Service Centre,
3rd Settlement - New Cairo
Unit# 16 Al-Motoreen,
Industrial Zone,
Sadat City - Monofya
Copyright © 2024 PESCO. All rights reserved. Privacy Policy