Reference Projects

  • SAFER, Yemen LNG Project - "C-Contract":
    Phase –I : Upstream Modifications’ Project E&I, Construction Supervision, QA/QC, Testing, Commissioning & Start-Up.
    Phase –II: Complete New Gas Plant / Power Plant Project, Electrical, Instrumentation, Civil, Mechanical, Construction Supervision, QA/QC, Testing, Commissioning and Start-Up. CPU Gas Expansion Piping Project: New Gas line with all the related facility, Mechanical (Piping), Construction Supervision & QA/QC.
    LPG Project: New LPG Storage and all related facilities - Yemen. (2010 / 2012)
  • SAFER, Raydan Field Final Expantion and Power Plant Project - “EC-Contract” - FEED, Detailed Engineering, Procurement Supervision, System Study, Installation, Testing, Commissioning and Start-Up - Yemen. (2007 / 2009)
  • Saudi Aramco/J.Ray McDermott - "C- Subcontract" Switchgear Testing and Commissioning, Subsea cables, Fiber Optic Cables Splicing and Termination, Platform top side Power Cables Testing and Termination for Safanayiah Phase I & Phase II projects; 115/13.8KV TP-18 Substation, 230/115/13.8KV TP-20 Substation, Marjan, Karan, Khafgi / Joint Operation, Hsabah & Arabiyah, Abu Safa, Manifa, 13.8KV&0.48KV equipment Ratawi Water Injection facilities - Jabal Ali, UAE & ARAMCO KSA Off-Shore Sites. (2012 / 2016)
  • SAFER – Ras Issa Storage Terminal Project - "E-Contract" - FEED & Detailed Engineering – Yemen. (2012)
  • ADCO, - "C- Subcontract" Replacement, Testing and commissioning of 33/11kV, 30/24MVA, ONAN/ONAF, 50Hz, YNd11, Oil Power Transformer & its Protection System - - UAE. (2012)
  • YHUNT, "EC Contract" for KPU/AL-Raja Oil Filed Power System Study, Al-Nasr "New Generators Control Panel" & "Switchgear Extension" Project, HALEWAH Ext. Project & Protection system PM- Yemen. (2006/2008)
  • SAFER, "EC Contract" & Procurement Supervision for CPU/ KPU/Al Raja Power System Study, Protection Rehabilitation & Upgrade project and Protection System PM - Yemen. (2005/2006)
  • ADMA-OPCO/GE , Zakum West Field, TURBO Power Generator (G130A/B) – "C-Subcontract" -Control and electrical System Upgrade, Testing and commissioning of Generator protection system and synchronization, Abu Dhabi- UAE. (2012)
  • Power System Study and Creation of Equipment Data Base for All Off-Shore Sites, Dubai Petroleum – Dubai - UAE. (2014 / 2015)
  • Saudi Aramco / Saipem Contracting, Fibre Optic Installation Project – Testing and other miscellaneous services – 1076044 Arabiyah, Hasbah & Karan – KSA. (2015)
  • Saudi Aramco / Snamprogetti – Offshore Services Submarine Composite Cables & ICCP cables – MRJN TP-9, MRJN 440/449 and ZULF 510/519 Platforms in Marjan and Zuluf Fields – KSA. (2016)
  • SAUDI ARAMCO / McDermott Submarine Composite Power & Fibre optic cable services – Testing and Termination – D6173 Abu Ali Project , KSA. (2016)
  • Oil and Gas Projects completion certificates

  • Petromasila 75 Power Plant, Fast track Project, Design, Review, Electrical, Instrumentation, Civil & Mechanical Construction Supervision, QA/QC, Testing, Commissioning and Start-Up of 3 GE gas turbines 25MW each. Yemen 2017-2018
  • Projects executed by Manpower Supply:
    Our Manpower has installed “Steam Turbines” in the following Power Stations:-
    - WEST DELTA POWER PLANT 2*350
    - TEBIN POWER PLANT 2*350
    - ABU KIR POWER PLANT 2*650
    - SUEZ HEAT POWER PLANY 1*650
  • Projects executed as an EC: the following “Steam Turbines” overhauling and maintenance :
    - “Turbine Overhauling, General Maintenance & Inspection Works’’ for Sidi Krir Power Plant -SEIMENS /Toshiba, Etaka Power Plant - SEIMENS, Ain Sokhna Power Plant - SEIMENS, Port Said Power Plant - WDEPC & Abu Qir Power Plant Project Unit 6 & 7 - WDEPC / Mitsubishi, East Port Said Power Plant - EDEPC / Toshiba.
    - “Adjsuting the Condeser and Sand Blasting of Turbines’’ for El Tibeen Power Plant Unit l - MDEPC / Alstom & East Port Said Power Plant - EDEPC / Toshiba.
    - “Supply of Manpower for Lifting Generator & Paiting Work’’ for Sidi Krir Power Plant Unit 4 - WDEPC & El Tibeen Power Plant Unit l - MDEPC / ALE
    - “Maintenance of HP, MSV, RSV’’ for Ain Sokhna Power Plant Unit 1- EDEPC / Toshiba.
  • CPU New Gas Plant Power Plant Project, - "C-Contract"- Yemen LNG Project-Phase –II, Design Review, Electrical, Instrumentation, Civil & Mechanical Construction Supervision, QA/QC, Testing, Commissioning and Start-Up of of 3*SOLAR Turbines Model: SENTURE SAFER-YLNG Yemen. (2010 / 2012)
  • Raydan Power Plant Project, - "EC-Contract"- FEED, Detailed Engineering, Procurement Supervision, System Study, Installation, Testing, Commissioning and Start-Up of 3*SOLAR Turbines Model: SATURN. SAFER-YLNG Yemen. (2007 / 2009)
  • Power Plants Projects completion certificates

  • TRANSCO / SIEMENS, ABU DHABI UAE, Contract N12258A Nahda 132/33KV Primary Substation Project, Installation Subcontract – UAE. (2015 / 2016)
  • TRANSCO, "EPC Contract" N14320 BNPP 220/33KV Mobile Substation – Additional Works, UAE. (2015 / 2016)
  • TRANSCO, "EPC Contract" N12315 TAWEELAH 400KV Substation, New Control Panels for Qty. 23* 400KV Bays Project, UAE. (2014 / 2015)
  • TRANSCO, "EPC Contract" N6892 Protection & Control System Rehabilitation Project, UAE. (2010 / 2011)
  • TRANSCO / ADDC / Electromontaj, Installation Subcontract -N12380 Madinat Zayed 33KV OHL to Water P/P Station – Related S/S Works, UAE. (2014 / 2015)
  • ADCO/ TRANSCO / SIEMENS ASAB/BAB/BUHASA 220KV & 33KV Substations Power Upgrade Project - "EC Subcontract"- P14386/Contract 15437.01/ Ec1083 - UAE. (2014/2015)
  • ABB / SEWA - Erection of Five (5)*132KV GIS Bays ABB Make, Wasit power plant & Protection Rehabilitation Works – UAE. (2013)
  • MITSUBISHI, DEWA 400/132 KV Technology Park S/S & Remote Ends – UAE, 300/132kV KIFAN-W S/S Testing, Commissioning & Maintenance –Kuwait, Ghazlan 380kV S/S Protection System Modification – Dmamm- KSA, Testing & Commissioning of ABB & Siemens Relays – Kotmal – Sirilanka. (2012 / 2013)
  • ADWEA / TRANSCO, ABU DHABI UAE, "EPC Contract" N12386 Replacement of existing DC Systems Rehabilitation Project, as an EPC Approved Contractor – UAE. (2014 / 2015)
  • VATECH / SIEMENS AG; 132KV W13 & W17 Substation Remote End Works – 2007 & W59, E4 & E11 S/S's Single to Double Bus Bar Upgrade Project with all the relevant Primary and secondary required modifications. (2004 / 2006)
  • GE KSA/ SCECO Testing and Commissioning of "Al-Safa 110/13.8kV S/S -Jeddah", "Saudi City 110/13.8KV S/S –Jeddah”, “Al-Taif 380/110KV -Al-Taif", "Khayber 110/33/13.8KV –Khayber". (2004 / 2005)
  • 132/11 KV CHNA Substation Testing and Commissioning – DANWAY -UAE.
  • East Ardiya'A', Farwanieh'C' and Farwanieh 'D' 132/11 KV SIEMENS substations, Testing and Commissioning, - Kuwait. (2010)
  • Umm Brika 400/220/132/11Kv Testing & Commissioning- ALSTOM ,Qatar. (2010)
  • 400/132kV H- S/S Protection Testing& Commissioning - SIEMENS-Dubai. (2007)
  • SAMRA 400kV S/S Testing & Commissioning - SIEMENS AG–Jordan. (2005 / 2006)
  • SAMRA 400kV S/S Ext.#1 Testing & Commissioning - SIEMENS AG -Jordan. (2007)
  • SAMRA 400kV S/S Ext.#2 Testing & Commissioning - SIEMENS AG –Jordan. (2008)
  • 33KV BAHIAH Substation Protection Upgrade - SIEMENS-Dubai. (2007 / 2008)
  • 132/11kV Emirates Cement Factory Substation S/S - AREAVA RAK - Egypt. (2007)
  • 220/66/11KV Abu Hamour S/S – VATECH/SIEMENS AG-Qatar. (2006)
  • AQABA S/S modifications works - VATECH/SIEMENS AG-Jordan. (2005)
  • Al-Safa 110/13.8kV S/S Testing and Commissioning - GE-KSA-Jeddah. (2004)
  • Saudi City 110/13.8KV S/S Testing & Commissioning – GE-KSA-Jeddah. (2005)
  • Al-Taif 380/110KV Testing & Commissioning – GE-KSA-Al-Taif. (2004 / 2005)
  • Khayber 110/33/13.8KV Testing & Commissioning – GE-KSA-Khayber. (2006)
  • Installation and commissioning of Electrical and Instrumentation system of cooling plant DCP2, at Zayed University, Abu Dhabi,- STELLER, UAE. (2011)
  • Zayed University Power System Study ,Al-Habtoor- ADDC, Abu Dhabi. (2011)
  • Zayed University Distribution Trafo.’s Testing Al-Habtoor- ADDC, Abu Dhabi. (2011)
  • Sorbonne University in Abu Dhabi - Testing & Commissioning of 4*22KV MV SIEMENS Switchgears. AL-Habtoor-, UAE –ABU Dhabi. (2010)
  • Sorbonne University 22kV System Power System Study, Al-Habtoor- Abu Dhabi. (2010)
  • Decommissioning, relocation and commissioning of metering and control panels, motor/generator set, AL-Ain University- UAE –Al Ain. (2012)
  • Power System Study Rihana Heights, Abu Dhabi, Kharafi National, UAE. (2011)
  • Substations Projects completion certificates